Visualisation: the hub building with timber cladding and roof solar panels, cycle path — start-up hub, Trikala
Street viewTeam CRE8

Passive House

Reconstruction to the Passive House standard · 1,004.7 m²

Building type
Office building
Location
Trikala, Greece
Area
1,004.7 m²
Status
1st place in the competition · implementation

Selected works 01Passive House

Elizabeth Iosifidi

A project to reconstruct an existing agricultural warehouse, changing its use and converting it into a multifunctional office centre for start-ups and coworking. The architectural concept is based on a flexible layout, natural light and the integration of the building into the urban environment.

Project information

Building type
Office building
Location
Trikala, Greece
Area
1,004.7 m²
Year
2021
Status
1st place in the competition · implementation
Award
1st prize
My role
Architectural engineer
Team
CRE8, five members
Software
PHPP, AutoCAD
Key figures
Heating demand 9 kWh/(m²a)Heating load 10 W/m²PHPP check: EnerPHit Classic
Exploded diagram of the building and Passive House principles Open full size: Exploded diagram of the building and Passive House principles
Visualisation: the former warehouse with timber cladding and HUB lettering on the gable, a cycle path with cyclists and pedestrians, a hill town in the background — start-up hub, Trikala
Exterior visualisation

The project covers the architectural design of the building and its facades, as well as landscaping of the surrounding site. The architectural and engineering solutions are based on Passive House principles aimed at improving the building’s energy efficiency. They include a ventilated facade system, a continuous thermal insulation envelope and airtight sealing of the building envelope. Particular attention was paid to the thermal design of junction details to reduce heat loss through thermal bridges. Ventilation with heat recovery, the use of natural light and passive cooling strategies are also provided.

Ventilated facade: thermal-bridge-free brackets Open full size: Ventilated facade: thermal-bridge-free brackets
Window opening details in the ventilated facade Open full size: Window opening details in the ventilated facade
Sheet G1: master plan and pergola details, 1:200 + 1:50 Open full size: Sheet G1: master plan and pergola details, 1:200 + 1:50

Outcome

1st prize, ΕΙΠΑΚ Architectural Student Competition 2021 (Hellenic Passive House Institute).

Pergola: plan, connection details, axonometric, 1:50 Open full size: Pergola: plan, connection details, axonometric, 1:50
Thermal-bridge model of the eave, Ψ = 0.015 W/(m·K) Open full size: Thermal-bridge model of the eave, Ψ = 0.015 W/(m·K)
Visualisation: facade with HUB lettering, pergola and cycle path — start-up hub, Trikala
General view
Visualisation: timber pergola between the two buildings, steps and lawn — start-up hub, Trikala
Pergola between the buildings
Visualisation of the open-plan office: desks, plants, TEAM lettering on the wall — start-up hub, Trikala
Open-plan office

Details

A raised plaza (+0.85 m) and a timber pergola link the hub to the neighbouring e-Trikala building. Inside: a shared kitchen, a projection room, an amphitheatre, a Passive House exhibition and coworking. PHPP energy model: ventilated facade, triple glazing (Uw 0.78), thermal-bridge analysis, mechanical ventilation with a subsoil heat exchanger; result: EnerPHit Classic.